[Case Study] Achieving Short Delivery Times through the Commissioning of Multiple Local Contractors
Elimination of one process in the pressing operation due to improvements in the mold! Introducing a case study from Tsubameki Co., Ltd.
We would like to introduce a case study of Tsubameki Co., Ltd., which performs cleaning, welding, polishing, assembly, and inspection of metal products. Our company aimed to achieve short delivery times through the outsourcing of multiple local contractors. As a result, we were able to eliminate one process in the pressing stage by improving the mold, successfully reducing the technical cost by approximately 30 yen per unit due to a reduction in man-hours. [Overview] ■ Achieved short delivery times through outsourcing to multiple local contractors ■ Result ・Successfully reduced technical costs by approximately 30 yen per unit due to a reduction in man-hours *For more details, please refer to the PDF document or feel free to contact us.